| |
Construction Cost: US
$88,000,000.00 This beautiful
five star hotel was completed in March 2000 and
is one of the newest hotels built since the 1964
Good Friday earthquake. All engineering design
exceeded the extra earthquake zone required by
the Uniform Building Code. The hotel has 400
guest rooms, indoor swimming pool, physical
fitness room, shops, four restaurants and lunge,
and a large ballroom for conventions that can
seat 2,500 people. Little Susitna Construction
was responsible for all electrical engineering
design and inspection, limited construction and
project management.
|
| |
Project Location: Anchorage,
Alaska |
| |
 |
|